F.A.U. Rt. 7901 West Lake Shore Drive Over South Fork Sangamon River

Located in Springfield, IL
217-793-8844
Located in Springfield, IL
Call Us Today
  • Slide title

    Proposed Structure

    Button
  • Slide title

    Proposed Bridge at Spillway

    Button
  • Slide title

    Existing Structure

    Button
  • Slide title

    Existing Structure

    Button
  • Slide title

    Construction Inspection

    Button
  • Slide title

    Substructure Construction

    Button
  • Slide title

    Superstructure Construction

    Button
  • Slide title

    Superstructure Construction

    Button
  • Slide title

    Superstructure Construction

    Button
  • Slide title

    Superstructure Construction

    Button

F.A.U. Rt. 7901 West Lake Shore Drive Over South Fork Sangamon River at Lake Taylorville Spillway

Taylorville, Christian County, Illinois


Greene & Bradford, Inc. provided Phase I, II & III service to the City of Taylorville of surveying, preparing plans and specifications, Construction Staking, Construction Guidance and Construction Inspection for structural replacement of the existing five-span structure and replacing it with four-span WF beam bridge and integral abutment on the same alignment. Farnsworth Group was utilized as sub-consultants for the Structural Design of the Bridge. The proposed Structure was 345-feet long and 30-feet wide. The work included performing Bridge Condition Reports, Hydraulics study, preparing Preliminary Bridge Hydraulic report and Contract Documents, Documentation of contract quantities and material inspection during the construction.

PROJECT DETAILS:


Client:

City of Taylorville


Services Provided:

Structural Engineering

Surveying

Drainage & Hydraulics

Roadway Design

Construction Staking

Construction Guidance

Construction Inspection


Size:

345-FT


Construction Cost:

$1,800,000


Construction Schedule:

November 2014



 

Share by: